North Plant/Overview
Interactive concept environment

All companies, people, records, costs, and integrations shown here are fictional demo data.

About this project ↗
Tuesday · August 11, 2026

Good morning, Maya.

Here is what needs attention across North Plant today.

Asset availability↑ 1.2%
97.8%Target 96.5%
Open work orders5 overdue
2714 scheduled · 8 in progress
PM compliance↑ 3.4%
91.4%134 of 147 completed on time
Maintenance costMTD
$84,620$12,380 under plan
Work pulse

Orders by status

76this month
New18In progress27On hold9Completed22
Reliability trend

Reactive vs. planned work

Planned ReactivePlanned work now 68%
Condition monitoring

Assets to watch

Priority queue

Work needing attention

OrderWorkAssetPriorityStatusOwnerDue
Investigate high vibrationCondition-basedAHU-04CriticalIn progressMK M. King2h overdue•••
Replace conveyor guardCorrectiveCV-02HighOpenJD J. DiazToday 2:00•••
Quarterly generator testPreventiveGEN-01MediumScheduledSL S. LeeTomorrow•••
Inspect steam trap bankInspectionSTM-B2MediumWaiting partsTR T. RossAug 13•••
Today

Team schedule

08:0010:0012:0014:0016:00
JDConveyor guard08:30–10:45
SLGenerator PM11:00–13:45
TRSteam trap route13:30–15:45
Connected operations

Data ingress pulse

Dynamics 365Parts, vendors, POs1,248 synced
SCADA historianMeter readingsLive · 2 sec
Building controlsAlarms, runtimeLive · 30 sec
Legacy asset importStaging validation12 exceptions
Work management

Work orders

Plan, assign, execute, document, and close maintenance work.

Open275 overdue
Unassigned6Needs triage
Waiting on parts4$3,840 committed
Completed this week3192% on schedule
Work orderAsset / locationTypePriorityStatusAssignedDueEst. hrs
AHU-04North roofCondition-basedCriticalIn progressMK2h overdue4.0•••
CV-02Packaging lineCorrectiveHighOpenJDToday2.5•••
GEN-01Utility yardPreventiveMediumScheduledSLAug 123.0•••
STM-B2Boiler roomInspectionMediumWaiting partsTRAug 135.0•••
PAL-01ShippingPreventiveLowCompletedSLAug 101.5•••
Request portal

Service requests

Capture, triage, approve, reject, or convert requests into planned work.

QR
REQ-2048 · 14 min ago

Water leaking beside packaging line

Submitted by Jamie Cole · Packaging

HighPhoto attached
REQ-2047 · 32 min ago

Break-room exhaust fan is noisy

Submitted by Facilities inbox

MediumEmail
M
REQ-2046 · 1 hr ago

Forklift charging cable damaged

Submitted by Avery Chen · Warehouse

HighMobile
QR
REQ-2045 · 2 hrs ago

Lighting out near receiving bay

Submitted by Devon Bell · Receiving

LowQR code
Preventive & predictive

PM & inspections

Calendar-based, meter-based, condition-based, and inspection-driven maintenance.

August 2026

Maintenance calendar

MON 10
HVAC filter route6 assets · Sarah
Fire pump weeklyFP-01 · Mike
TUE 11
Generator load testGEN-01 · 11:00
Boiler inspectionBLR-02 · 14:30
WED 12
Conveyor lubrication4 assets · John
THU 13
Vibration route12 assets · Maya
Safety shower checks8 stations
FRI 14
Steam trap survey22 traps · Tom
On-time completion

PM compliance

91.4%Target 95%
147Due this month134On time7Late6Forecast risk
Active library

Maintenance plans

PlanTriggerAssetsNext dueCompliance
HVAC quarterly serviceJob plan JP-101Every 90 days18Aug 1896%•••
Compressor oil analysisLab + inspection1,000 runtime hrs4237 hrs100%•••
Process pump vibrationCondition routeWeekly / threshold22Aug 1388%•••
Forklift safety inspectionMobile checklistEvery shift12Today90%•••
Digital checklists

Inspection completion

Safety88%Quality96%Environmental82%Operator care93%
Planning & dispatch

Planner & dispatch

Balance ready work, craft capacity, production windows, parts, permits, and response priorities.

Ready backlog28116 estimated labor hours
Today's capacity31.5 h4 technicians + 1 contractor
Parts ready92%2 jobs awaiting material
Schedule risk31 production conflict · 2 skill gaps
Tuesday, August 11Day shift · 06:00–18:00
Planned In progress At risk
06:0008:0010:0012:0014:0016:0018:00
JDJohn DiazMechanical · 7.5 / 10 h
SLSarah LeeElectrical · 6 / 10 h
TRTom RossFacilities · 8 / 10 h
MPMaya PatelPlanner · 4 / 8 h
Production windowsLine 2 breakUtilities isolation
01
Job plan completeScope, tasks, duration, and acceptance criteria
26 / 28
02
Materials availableReservations verified against available stock
26 / 28
03
Safety & permitsLOTO, permits, and risk controls checked
28 / 28
04
Operations agreementProduction windows and handback owners
27 / 28
Enterprise asset management

Asset registry

Hierarchy, lifecycle, criticality, condition, documents, meters, costs, warranties, and work history.

AssetCategoryCriticalityConditionOpen workLast serviceLifecycle cost
Production equipmentCritical A 94 Good2Aug 3, 2026$184,220•••
Material handlingCritical B 78 Watch3Jul 29, 2026$46,810•••
HVACSupport 62 Critical4Jul 18, 2026$91,340•••
Packaging equipmentCritical B 91 Good1Aug 8, 2026$72,095•••
Condition monitoring

Meters & IoT

Runtime, counters, inspections, live sensors, alarms, and condition-based triggers.

Streaming points42899.8% reporting
Open alarms71 critical · 6 warning
Work created by rules18Last 30 days
Readings processed12.8MThis month
AHU-04 · Bearing 2

Vibration velocity

Live · mm/s RMS
Normal < 4.5 Warning 4.5–7.1 Alarm > 7.1Current 7.4 mm/s
Rule engine

Active alerts

CRITICALAHU-04 vibration above alarm

7.4 mm/s for 18 minutes

WO-10682 created automatically
WARNINGP-204 seal temperature rising

84.2°C · +8% over 24h

Assigned to condition route
WARNINGCMP-02 service interval near

763 of 800 runtime hours

PM forecast in 5 days
Connected points

Meter register

MeterAssetSourceReadingQualityUpdated
VIB-AHU04-B2AHU-04SCADA / OPC UA7.4 mm/sGood2 sec ago
RUN-CMP02CMP-02PLC / MQTT763.2 hrsGood6 sec ago
TEMP-P204-SEALP-204Historian API84.2°CSuspect12 sec ago
CYC-CV02CV-02Edge gateway1,284,209Good21 sec ago
Materials management

Parts inventory

Stock, reservations, issues, returns, cycle counts, reorder points, and multi-store transfers.

Inventory value$428,9403,846 stocked items
Below reorder point144 critical stockouts
Reserved for work$26,78043 active reservations
Count accuracy98.6%Target 98%
PartDescriptionOn handReservedAvailableReorder pointUnit costBin
BRG-6205-2RSSKF 6205-2RSHDeep groove ball bearing18 EA4148$24.80A-03-12
FLT-AHU-M1324×24×2MERV 13 pleated filter3 EA2112$18.40B-01-04
BELT-B68Gates B68V-belt, wrapped11 EA296$31.20A-04-08
SEAL-P204-KITFlowserve kitMechanical seal repair kit0 EA002$684.00C-07-02
OIL-ISO46-20LHydraulic oilISO VG 46, 20 litre pail22 EA3198$92.15FL-02
Procure to pay

Purchasing

Requisitions, approvals, quotes, purchase orders, receipts, returns, and ERP synchronization.

Draft requisitions4

PR-00981 · Main StoresAHU filter replenishment

24 × FLT-AHU-M13

$441.60

Awaiting approval3

PR-00978 · Critical partP-204 mechanical seal kit

2 × SEAL-P204-KIT

$1,368.00

Ordered11

PO-260814 · Motion SupplyBearings & power transmission

Expected Aug 13 · ERP synced

$3,842.10

Ready to receive5

PO-260807 · Industrial FlowPump spares

3 lines · Dock 2

$7,120.00
Year to date

Maintenance procurement

$286,400Committed spend92%Preferred vendor spend4.8 daysAverage lead time$18,240Avoided rush freight
Supplier lifecycle

Vendors & contracts

Approved suppliers, services, scorecards, insurance, contracts, warranties, and spend.

MSMotion Supply Co.Bearings · Belts · MROPreferred
97%On time99%Order accuracy4.8Quality
$84,220 YTDContract to Dec 2027
IFIndustrial FlowPumps · Seals · ServiceApproved
91%On time98%Order accuracy4.6Quality
$62,780 YTD2 warranties active
CRControls & ReliabilityAutomation · CalibrationApproved
94%On time96%First-time fix4.7Quality
$44,960 YTDInsurance current
Risk & renewals

Contracts and credentials

DocumentVendorCoverageExpiresOwnerStatus
Annual service agreementControls & ReliabilityPLC / SCADA supportSep 30, 2026Maya Patel50 days
Certificate of insuranceIndustrial Flow$5M liabilityJan 15, 2027ProcurementCurrent
Parts supply agreementMotion Supply Co.MRO catalogueDec 31, 2027Alex GrayCurrent
Pressure vessel certificationPrairie InspectionBoilers BLR-01/02Aug 26, 2026Sarah Lee15 days
Reliability intelligence

Reports & analytics

Costs, downtime, labor, backlog, compliance, failure analysis, MTBF, MTTR, and custom KPIs.

Composite KPI

Reliability score

↑ 4.2 pts
86.4
Availability 97.8PM compliance 91.4Planned ratio 68.0Schedule compliance 88.6
Maintenance spend

Cost by category

$642,880 YTD
Pareto

Downtime by failure mode

Mechanical wear42.1 hControls / sensor31.2 hMaterial jam21.6 hElectrical18.1 hOperator setup12.2 h
Library

Saved reports

Connected data foundation

Data ingress

Bring operational data in through APIs, files, databases, messages, industrial protocols, and human review.

Active pipelines9 / 10One requires review
Records today184,20499.3% accepted
Average latency8.4 secAcross streaming sources
Quality exceptions2312 asset · 8 part · 3 meter
Selected pipeline

Dynamics 365 → AssetOps

01SourceDynamics 365 REST API
02LandImmutable staging
03ValidateSchema + quality rules
04TransformMap + enrich
05PublishCMMS records + audit
DirectionBi-directionalLast successful run38 sec agoRows last run1,248OwnerData operationsAudit retention7 years
Field mapping

Incoming part records

SourceTransformCMMS targetQuality
ItemNumberpart_number100%
ProductNametrim · title casedescription99.8%
OnHandQtydecimal → numberquantity_on_hand100%
DefaultVendorlookup vendor_idpreferred_vendor98.1%
UnitCostCAD · 2 decimalsstandard_cost100%
Governance

Data quality queue

12
Asset parent not foundLegacy CSV · hierarchy validation
8
Vendor code unmatchedERP · reference data lookup
3
Meter reading out of rangeSCADA · plausibility rule
Observability

Pipeline activity

Live

ACCEPTERP / parts1,248 records committed

EVENTSCADA / AHU-04alarm threshold → WO-10682

REVIEWCSV / assets12 parent references unresolved

ACCEPTBMS / runtime86 points published

EVENTEmail / requestREQ-2047 created with attachment

Supported concept patterns
REST / GraphQL APIsWebhooksSQL databasesSFTP / CSV / ExcelOPC UA / historianMQTT / IoTEmail ingestionBarcode / QRMobile offline syncManual review queues

Production implementations would add organization-specific credentials, security controls, retention, monitoring, and approved integration middleware.

Workforce management

People & labor

Teams, shifts, skills, certifications, assignments, time, contractors, and capacity.

MPMaya PatelMaintenance managerAvailable
31 / 40 hrs
PlannerReliabilityElectrical L2
JDJohn DiazMechanical technicianOn shift
35 / 40 hrs
MillwrightWeldingLOTO
SLSarah LeeElectrical technicianOn shift
25 / 40 hrs
Electrical L3PLCArc flash
TRTom RossFacilities technicianLeave Fri
29 / 40 hrs
HVACBoilerGas fitter
This week

Capacity by craft

Mechanical88%Electrical74%Instrumentation93%Facilities68%Contractor44%
Compliance

Certification renewals

15d
Confined space attendantJohn Diaz · expires Aug 26
31d
Boiler operator certificateTom Ross · expires Sep 11
84d
Arc flash qualificationSarah Lee · expires Nov 3
Connected field execution

Mobile field app

Execute work, inspections, readings, parts, time, photos, signatures, and approvals—even offline.

AssetOps Field10:42Online
WO-10682 · IN PROGRESSInspect high vibration alarm

AHU-04 · North roof · High priority

2/5
!
LOTO verification requiredConfirm isolation before removing guard.
QR
Identify anything quickly

Scan asset, location, part, bin, tool, or inspection labels to open the right record.

Barcode + QR
OFF
Offline-first execution

Download assigned work and safely queue photos, readings, time, and signatures for sync.

Conflict aware
SAFE
Safety at the point of work

Require LOTO, permits, risk assessments, conditional tasks, and supervisor approvals.

Auditable
TIME
Actual labor and downtime

Start, pause, and stop timers by craft while recording operational impact and delay codes.

Cost ready
PART
Parts without paperwork

Reserve, issue, return, transfer, and count materials with bin-level availability.

Live stock
SIGN
Quality closeout

Capture failure coding, meter readings, before/after evidence, handback, and e-signature.

Complete history
Configuration

Settings

Organization, sites, taxonomies, security, notifications, automation, mobile, and audit controls.

Organization

Sites and operating structure

Configure the hierarchy used for permissions, reporting, inventory, labor, and shared standards.

N1North PlantPrimary · America/Denver · CADActive
DCDistribution CentreAmerica/Denver · CADActive
S2South PlantAmerica/Chicago · USDActive
Automation

Selected workflow rules